Nestled in the scenic heart of Rasa, Hulu Selangor, lies a unique company that stands as a beacon of innovation and dedication. Guided by the visionary leadership of its founder, Teow Beng Hur, HC Precast System Sdn. Bhd. has revolutionized the Malaysian construction industry with its groundbreaking Industrialized Building System (IBS) technology. As the construction landscape evolves, HC Precast System stands out not just for its advanced techniques but for its unwavering commitment to building quality, sustainable homes for every Malaysian house buyer.
The Founder’s Inspirational Journey

Teow Beng Hur, the founder of HC Precast System Sdn. Bhd.
The story of HC Precast System is deeply intertwined with the personal journey of its founder whose early life was marked by significant hardships. Losing his father at 11 years old, Teow faced the challenges of growing up without a paternal figure. This loss brought immense responsibility upon him, compelling him to step up at a tender age to support his family.
Despite these difficulties, Teow’s resilience shone through. He became a secondary school dropout, not out of choice but necessity. The need to earn money to support his family took precedence over formal education. Leaving school to join the construction field, he started from the bottom, gaining hands-on experience and slowly venturing on his own. He then formed a sole proprietorship company and worked as a subcontractor.
During project handovers, Teow often noticed numerous defects arising from traditional construction methods, leading to client complaints. Determined to find a better way, he explored existing IBS systems, only to find them riddled with errors and substandard quality. Unwilling to compromise, he invested in research and development to create a superior system.
In 2002, following years of unwavering dedication and tireless research, Teow founded HC Precast System Sdn. Bhd. This pivotal moment marked his commitment to enhancing construction methods. The establishment of his company aimed to not only improve upon traditional methods, but also to pave the way for more efficient, higher quality, and sustainable solutions through IBS technology.
“IBS provider is the one who knows the way, gets the way, corrects the way, and shows the way.”
Transforming 3 Weeks into 3 Days
The impact of IBS technology on the construction timeline is profound. Traditional construction methods are often time-consuming and labor-intensive. In contrast, HC Precast System prioritizes speed, consistency, functionality, and quality control. A remarkable example of this is their single-storey semi-detached houses project in Sg. Soi, Kuantan, Pahang.


Their semi-detached houses project in Sg. Soi, Kuantan, Pahang.
“Traditional methods would require roughly 2 to 3 weeks, with 20 to 30 workers to build one house. But with our IBS technology, we accomplished the task in just 3 days with only 7 workers,” Teow shared.
This dramatic reduction in construction time highlights the transformative potential of IBS technology in the construction industry. By reducing waste, reusing moulds, and requiring a smaller workforce, the overall costs are lowered. The shorter completion times and higher quality finishes also lead to happier house buyers, fewer complaints, and increased customer satisfaction.
Innovative Technology and Quality Commitment
Teow’s primary focus is clear – to build quality houses. This commitment to innovation and quality is evident in every aspect of their work. Unlike traditional construction methods, HC Precast System employs a unique IBS technology that has registered certified intellectual property (IP). This technology is not only a first in Malaysia but is also exclusive to this company, setting them apart from competitors.

The distinctive IBS technology used provides water resistance and stops shear structural cracks from occurring.
One of the standout features of their IBS technology is the use of four essential elements required to complete a building with a wet joint system. This system ensures water resistance and prevents shear structural cracks, addressing common issues faced by conventional construction methods. The company’s in-house engineering capabilities for mould fabrication further enhance their offering, thus providing a comprehensive build and design service that is unmatched in the Malaysian market.
Teow also believes in making sustainability a core principle in his company. The reusable nature of IBS elements, including moulds, formwork, and accessories, contributes to environmental sustainability and cost-effectiveness. The controlled production environment of IBS minimizes waste generation and optimizes logistics, further reducing the environmental footprint of their projects.
“My hope is for Malaysia to use the IBS system to provide quality homes for the people.”
Recognitions and Achievements
The company’s focus on innovation and quality is further evidenced by the numerous recognitions and achievements of HC Precast System. Recognized by professionals and experts worldwide, the company founder’s trademarked technology has earned acclaim and accolades, including the prestigious CIDB Fellowship Award in 2023.

Teow Beng Hur, the visionary founder of the company, received the esteemed CIDB Fellowship Award in 2023.
“I actually didn’t intend to participate. My friend forwarded the application for the award, but I said don’t waste my time. I’m not even a high school graduate,” Teow said.
His friends, recognizing his remarkable achievements and dedication, kept encouraging him to apply for industry recognition. Reluctantly, and without much hope, he decided to submit an application. To his astonishment, he received a letter from CIDB, informing him that he had been granted the prestigious award. This award acknowledges Teow’s major contributions to the construction field in Malaysia and strengthens his reputation as an industry innovator.

Their system withstood an earthquake with 7.4 magnitude without displaying any visible cracks or damages.
Another example of significant milestones of HC Precast System was the earthquake resistance test conducted in collaboration with Universiti Teknologi Malaysia (UTM). The test involved subjecting a scaled-down double-storey building to simulations of eight major earthquakes. Their system performed exceptionally well, showing no visible cracks or damages even at a magnitude of 7.4.
Looking Ahead
Teow envisions a future where IBS technology continues to evolve and adapt to meet emerging challenges. Ensuring that their IBS systems can withstand earthquakes is a key focus, reflecting their commitment to safety and resilience. Additionally, he advocates for incentives to encourage the adoption of IBS technology by contractors, developers, and manufacturers, promoting a more widespread and sustainable approach to construction.
By prioritizing quality, efficiency, sustainability and safety, his company is setting new standards for building homes in Malaysia. His journey, marked by resilience and relentless pursuit of excellence, serves as an inspiration to the industry.
HC Precast System Sdn Bhd
Address: No.23, Jalan Seri Sarawak 20B/KS2, Taman Seri Andalas, 41200 Klang, Selangor Darul Ehsan.
Website: hcprecast.com
Phone: 603-3325 8995
Fax:603-3325 8996
Email: enquiry@hcprecast.com
Discussion about this post